Views: 5 Author: Site Editor Publish Time: 2024-06-26 Origin: Site
1. **Material Testing**: Before the pipe manufacturing begins, the raw materials (steel sheets or strips) are tested for their chemical composition and mechanical properties. This ensures that the materials meet the required specifications for strength, durability, and corrosion resistance.
2. **Dimensional Check**: The dimensions of the pipe, including wall thickness, diameter, and length, are measured to ensure they conform to the desired standards and customer specifications.
3. **Weld Inspection**: ERW pipes are welded along their length using electric resistance welding. The welds are inspected visually and often with the help of non-destructive testing methods like ultrasonic testing to ensure the welds are sound and free from defects.
4. **Pressure Testing**: The pipes are pressure tested to check their ability to withstand internal pressure. This test is crucial to ensure the pipes can safely carry fluids or gases without leaking.
5. **Surface Quality**: The external surface of the pipe is examined for any imperfections like burrs, scales, or surface cracks. These defects can affect the pipe's functionality and appearance.
6. **Threading and Fitting Testing**: If the ERW pipes are intended for threaded connections, the threads are inspected for accuracy and smoothness. The fittings are also tested to ensure they fit properly and can withstand the intended pressure and temperature conditions.
7. **Chemical Analysis**: In some cases, a sample from the pipe may be taken for chemical analysis to ensure the final product meets the required material specifications.
8. **Leak Testing**: Leak tests are conducted to ensure that the pipes are fully sealed and do not have any pinholes or other defects that could cause leaks.
9. **Performance Testing**: Depending on the application, the pipes may be subjected to additional performance tests, such as fatigue testing, to simulate the conditions they will encounter in use.
10. **Quality Certification**: Once the pipes pass all the necessary tests, they are often certified by relevant industry standards organizations, such as ASTM, API, or EN.
11. **Final Inspection**: The pipes go through a final visual inspection before being packed and shipped to the customer. This inspection ensures that the pipes are in good condition and properly labeled.
About Us / News / Product / Project / Quality Assurance / Service / Contact Us