Seamless Tube Manufacturing Process

Views: 2     Author: Site Editor     Publish Time: 2024-09-19      Origin: Site

The manufacturing process for seamless tubes involves several key steps. Here's an overview of the essential stages:


1. Raw Material Selection


Material Choice: Typically, high-quality steel or alloy is selected as the raw material for seamless tube production.


2. Billet Preparation


Heating: Steel billets are heated in a furnace to a temperature that makes them malleable (usually around 1100-1300°C).


Cutting: The heated billets are cut to the desired length for further processing.


3. Piercing


Piercing Mill: The heated billet is then passed through a piercing mill, where it is subjected to high pressure to create a hollow tube. This is done using a piercer that drives a mandrel into the billet, forming a hollow shell.


4. Elongation


Stretching: The pierced tube is elongated using a series of rollers and a plug that is placed inside the tube. This process helps achieve the desired length and diameter.


5. Re-Rolling


Rolling Process: The elongated tube is then passed through a series of rollers to refine its dimensions and improve surface finish. This step may take place in both hot and cold rolling mills.


6. Heat Treatment


Normalization or Annealing: The tube may undergo heat treatment to relieve stresses and improve mechanical properties. This involves heating the tube to a specific temperature and then cooling it.


7. Sizing


Sizing Mill: The tube is passed through a sizing mill to ensure it meets specified diameter and wall thickness tolerances.


8. Finishing


Surface Treatment: The surface of the tube is treated to remove any scale or impurities. This may include processes like pickling or shot blasting.


Inspection: The tubes are inspected for defects, such as cracks or inconsistencies.


9. Testing


Quality Control: Various tests are conducted, including hydrostatic testing, ultrasonic testing, and dimensional checks to ensure the tubes meet required specifications.


10. Packaging and Shipping


Final Inspection: After passing all tests, the tubes are packaged securely for shipment to customers.


RELATED PRODUCTS

Providing professional one-stop procurement service for customers with excellent quality, competitive price, convenient transportation, and timely delivery.
  22nd Floor, Royal Wing Tower, Long Champ International Building, No.9 Xiangfu Road, Changsha, Hunan, China, PC:410116
  sales@threewaysteel.com
  0086-0731-8873-9521                                             

Products

Quick Links

Contact Us
About Us
Copyright © 2020 Threeway Steel Co.,Ltd. All rights reserved.