Project name: UAE 250MW/500MWh Compressed Air Energy Storage (CAES) Plant Alloy Piping, Structural Supports & Tank Material Supply Project Product: Alloy seamless pipes, alloy pipe fittings, structural supports, thermal storage tank plates Size&Standard: Alloy seamless pipes: ASTM A335 P11/P22, A213 T11/T22, Inconel 625/600, OD 10mm-1340mm, WT 2mm-260mm, comply with ASTM/ASME international standards. Alloy fittings: elbows, tees, reducers, caps, up to DN 3200, Class 2500, forged or fabricated, alloy steel & duplex stainless steel optional. Structural components: pipe supports, hangers, slide plates, forged flanges & anchors, high-strength alloy steel, hot-dip galvanized anti-corrosion treatment. Thermal storage tank plates: ASTM A387 Gr.91/Gr.22, Inconel 625 clad lining, duplex stainless steel baffles, internal heat-exchange coils in Inconel 600/625, designed for up to 565°C and 16MPa per ASME Section VIII Div.1, suitable for molten-salt thermal energy storage systems in CAES p
Project name: Malaysia Petrochemical Heat Exchange Fin Tube & Special Shaped Tube Supporting Project Product: High-frequency welded finned tubes, seamless special shaped tubes Size&Standard: Heat exchange finned tubes: Carbon steel & stainless steel optional, comply with ASTM/EN international standards, customizable fin height, spacing and thickness, adopt hot-dip galvanizing anti-corrosion treatment; used for waste heat recoverers, industrial radiators and air preheaters. Special shaped tubes: Precision cold-drawn integrated forming, oval, flat round, rectangular, corrugated reducing and other non-standard cross-sections available, support necking, expanding, bending deep processing, dimensional tolerance ±0.05mm, carbon steel, alloy steel and stainless steel raw materials for selection, suitable for compact installation space of heat exchange equipment and fluid delivery systems. Cost: $2.8 Million Country: Malaysia
Project name: Abu Dhabi West-East 1 Pipeline Project Product: CCarbon Steel Flanges: Slip-on and welded neck flanges (DN50-DN300) with Class150/Class300 pressure ratings Size&Standard:Load-bearing structural parts: Q355B high-strength carbon steel, featuring high tensile strength and excellent deformation resistance for heavy-load scenarios;Pipeline connection & sealing parts: ASTM A105 GR.B forged carbon steel, with dense microstructure and stable high-temperature & pressure resistance, ideal for oil and gas transmission systems;Auxiliary structural parts: Q235B / ASTM A36 carbon steel, with low impurity content, superior weldability and flatness Cost: $3.5 Million Country: UAE
Project name:Southeast Asia Power Plant High Temperature and High Pressure Steel Pipe System Project Product:ASME B16.5 WN 150LB 304 Stainless Steel Welding Flange Size&Standard:Pressure rating Class 150LB (corresponding to PN20), nominal diameter DN150-DN300, material 304 stainless steel, raised face (RF) sealing surface, neck length 1.2 times the pipe diameter, welding method is butt welding, applicable temperature -20℃~+550℃, conforms to ASME B16.5 standard, and can be directly adapted to seamless connection of American standard and national standard steel pipe systems Cost: $4.5 Million Country: Southeast Asia
Project name:Europe natural gas booster project InfrastructureProduct: Bending Pipe Welded En Standard Steel Grade: 355j0 Cost: $7.5 Million Country: Europe
Project name: Oman pipeline replacementProduct: LSAW steel pipeSize: API 5L PSL2*52Quantity: 8000 MTYear: 2016Country: Oman