NEWS
Home / News
  • How to prevent decarburization of spiral welded pipe
    How to prevent decarburization of spiral welded pipe
    2021-09-28
    For spiral welded pipe, the service life is the most important part of the buyer, and the most important part of the service life of spiral welded pipe is to keep the surface of the steel pipe from decarburization. It is well known that after the surface of spiral welded pipe is decarburized, its st
    Read More
  • API 5L/ASTM A106 GR.B Seamless Steel Pipe Price list
    API 5L/ASTM A106 GR.B Seamless Steel Pipe Price list
    2021-09-24
    Seamless Steel Pipe API 5L/ASTM A106 GR.B OD>60.3 BE,OD<60.3 PE,Black painting,ends with caps,length 6mOut Diameterwall thicknessFOB Tianjin(by full container)wall thicknessFOB Tianjin(by full container)Inchmmmm/sch40 USD/TONUSD/Mmm/sch80 USD/TONUSD/M1/4"13.72.24$1,550.4$1.03.02$1,550.40 $1.20 3/8"1
    Read More
  • What is the difference between the oil casing and oil drill pipe
    What is the difference between the oil casing and oil drill pipe
    2021-09-24
    From the appearance point of view, there are two differences between oil casing and oil drill pipe:1. The usage of products2. The material of products As we know, the oil casing is a steel pipe used to support the wall of oil and gas wells. Its function is to ensure the normal operation of the entir
    Read More
  • The difference between fixed welds, welds, and prefabricated welds in pipeline welding
    The difference between fixed welds, welds, and prefabricated welds in pipeline welding
    2021-09-24
    In long-distance pipeline transportation projects, pipeline welding is often the most important processing step, so the choice of welding joints and welding methods during processing will become more important. In general welding operations, fixed welding, rotary welding, and prefabricated welding a
    Read More
  • Total 340 pages  Go to Page
  • Go
Providing professional one-stop procurement service for customers with excellent quality, competitive price, convenient transportation, and timely delivery.
  22nd Floor, Royal Wing Tower, Long Champ International Building, No.9 Xiangfu Road, Changsha, Hunan, China, PC:410116
  sales@threewaysteel.com
  0086-0731-8867-8598                                             

Products

Quick Links

Contact Us
About Us
Copyright © 2020 Threeway Steel Co.,Ltd. All rights reserved.