2021-10-27 1. Steel pipe piles need to be properly stackedThe stacking site is required to be flat to ensure that large vehicles can enter directly. For the low-lying area of the site, it is necessary to pave road slag or road wood under the supporting point for artificial reinforcement, and it is necessary to
Read More
2021-10-26 1. Visual inspection.The visual inspection of welded joints is a simple procedure with a wide variety of inspection methods. It is an important part of finished product inspection, mainly to find welding surface defects and dimensional deviations. Generally, the test is carried out by visual observa
Read More
2021-10-25 First of all, it may be due to the stress of the spiral welded steel pipe. That is, the residual stress and welding stress after the steel pipe is formed.Secondly, due to the presence of hydrogen. If the flux is not dried enough, the preheating temperature is insufficient or the p
Read More
2021-09-30 THREEWAY STEEL API 5L/ASTM A106 GR.B Seamless Steel Pipe Price list Sep. 29th, 2021NO.Product NameOut Diameterwall thicknessFOB Tianjinwall thicknessFOB Tianjinmm(by bulk vessel)mm(by bulk vessel)1SMLS3/8"17.12.31US$1327.83/TON3.2US$1327.83/TON2SMLS1/2"21.32.77US$1211.55/TON3.73US$1211.55/TON3SML
Read More