NEWS
Home / News
  • Technical requirements and processing methods of straight seam welded pipe
    Technical requirements and processing methods of straight seam welded pipe
    2023-03-29
    Technical requirements for straight seam welded pipes:The technical requirements and inspection of straight seam welded pipes are based on the provisions of the GB3092 "Welded Steel Pipes for Low-Pressure Fluid Transmission". It can be delivered according to fixed length or double length. The surfac
    Read More
  • Spiral steel pipe dredging common problem
    Spiral steel pipe dredging common problem
    2023-03-28
    When the spiral steel pipe is blocked, it will not only affect our use but also have a certain corrosion effect on some materials inside the pipe. Therefore, if it is not dredged in time, it will have a very bad effect after a long time.The first is to wash with water and use the pressure of water t
    Read More
  • What are the advantages of using hot-dipped plastic steel pipes
    What are the advantages of using hot-dipped plastic steel pipes
    2023-03-27
    Compared with plastic pipes and composite pipes, the quality of hot-dipped plastic pipes combines the advantages of various pipes: it has the strength of steel pipes, and the corrosion resistance, wear resistance, and small fluid resistance of plastic pipes. It is a green pipeline with high safety a
    Read More
  • How to Realize the Automatic Flaw Detection and Eddy Current Detection of Tubing Couplings
    How to Realize the Automatic Flaw Detection and Eddy Current Detection of Tubing Couplings
    2023-03-24
    The oil industry is inseparable from various pipelines. For a long time, oil production plants have been troubled by the recycling of oil steel pipes, because a large number of oil pipes go directly into the well without inspection and treatment, and may break down or leak at any time, leaving hidde
    Read More
  • Total 355 pages  Go to Page
  • Go
Providing professional one-stop procurement service for customers with excellent quality, competitive price, convenient transportation, and timely delivery.
  22nd Floor, Royal Wing Tower, Long Champ International Building, No.9 Xiangfu Road, Changsha, Hunan, China, PC:410116
  sales@threewaysteel.com
  0086-0731-8867-8598                                             

Products

Quick Links

Contact Us
About Us
Copyright © 2020 Threeway Steel Co.,Ltd. All rights reserved.